Project Description
Storlia power plant are located close to Riksveg 7 Hardangervidda. The new facility consists of about 1,100 meters of tunnels as well as a power station
The installation of a 8 MW generator will produce about 34 GWh per year – the equivalent of yearly consumption of electricity to some 1500 households.
NLI Scope
Electro engineering and installation.
Connection of HV cables, erection and connection of main components such as power transformers, generator and UPS.