Project Description
Stølselva power plant is located east of Førde city center. The plant consists of one Pelton turbine with vertical synchronous generator. The installed power of the plant will be 2.2 MW.
NLI Scope
Electro installation HV/LV.
Power cables for intake, control system, fiber connections as well as standard electro installation for buildings
Contact
Olav Bolseth
Mail: olav.bolseth@nli.no