Fabrication and erection of new snow protection tunnel at Ofotbanen, including demolition of existing structures. The snow tunnel are constructed with steel main support system, furthermore the underlying steel structure shall be clad with steel plates roof and ore pine panels on the walls.
Length: approx. 300 m
Steel: approx. 255 tonnes
Ore pine: approx. 30,000 lm