Client: AGA
Project: Kårsus, Relocation of Air Gas Plant
Place: Susort, Sweden / Kårstø, Norway
Year: 2013
Delivery: Strip down existing steel structures and E&I, material handling, transport and rebuilding, MC and test
  • share
  • Linkedin
  • Facebook
  • Twitter
Relocation of Air Gas Plant, Kårsus

NLI Scope

Total removal, transport and reconstructing of the factory.
The project included removal of “coldbox” (55.5 m high), 2 large tanks (about 11 m high and diameter of about 10 m), 2 smaller tanks, pipes, other equipment, electrical and instrument, transport from Köping in Sweden to Susort in Norway, complete assembly in Norway, surface treatment of “coldbox” and the big tanks, MC and test.