NLI Scope
Total removal, transport and reconstructing of the factory.
The project included removal of “coldbox” (55.5 m high), 2 large tanks (about 11 m high and diameter of about 10 m), 2 smaller tanks, pipes, other equipment, electrical and instrument, transport from Köping in Sweden to Susort in Norway, complete assembly in Norway, surface treatment of “coldbox” and the big tanks, MC and test.
Contact
Morten Hassum
Mail: morten.hassum@nli.no