Project Description
Prior to construction of new E-18 Farris Bridge, there is a need for establishment of new floating guide boom to reduce the probability of clogging of the flood hatch by limiting the amount of timber finding its way to the hatch.
NLI Scope
Prefabrication and installation of complete guide boom with skirt. Length 96 m with a 6 m walkway, railings on one side and 1 off lockable gate.
Contact
Tommy Hansen
Mail: tommy.hansen@nli.no