Client: ABB Power Grids AS
Project: Mobile Converter at Kjelland, Steel Strucure
Place: Egersund, Norway
Year: 2020
Delivery: Delivery and installation of steel structure
  • share
  • Linkedin
  • Facebook
  • Twitter
Steel Structure, Mobile Converter at Kjelland

Project Description

Bane NOR are renewing Kjelland converter station in Eigersund. In this connection, a mobile static converter system for supplying electrical power to the train traffic during the conversion period are established. The mobile plant will convert electrical power from 50 kV, 3 phase and 50 Hz to 15 kV, single phase and 16.7 Hz.

NLI Scope

Delivery and installation of tailor-made steel structure for a mobile converter consisting of an oil tank, roof panel, snow protection, flame retardant gratings.

Contact

Knut Sælebakke
Mail: knut.saelebakke@nli.no