Client: NRC Bane
Project: UDK 33 Vestfoldbanen, Pedestrian Bridge
Place: Drammen, Norway
Year: 2020
Delivery: Steel fabrication and installation
  • share
  • Linkedin
  • Facebook
  • Twitter
Pedestrian bridge, Kreftings gate in Drammen

Project Description

Bane NOR is building a new double track from Drammen to Kobbervikdalen, and from Drammen to Gulskogen. Included in the project are two new and future-oriented stations in Drammen and at Gulskogen.
Construction work officially started on 19 December 2019. The double track from Drammen to Kobbervikdalen will be completed by the end of 2025.

NLI Scope

Fabrication, transport and installation of pedestrian bridge over Kreftings Gate in Drammen. The steel bridge is 37 meter long, 5,7 meter wide, and has a total weight of 35 tonnes.
View installation video

In addition, NLI has delivered cable yokes, columns for noise barrier walls and construction road plates.
Total weight of deliveries approx. 120 tons