Client: Enwa PMI
Project: Energy Central at Military Airport
Place: Ørlandet, Norway
Year: 2017
Delivery: E&I installation
  • share
  • Linkedin
  • Facebook
  • Twitter
Energy Central, Ørlandet Military Airport

Project Description

In connection with the development of Ørlandet fighter aircraft base, a new heat and cooling supply for the new building mass will be established and at the same time replace fossil fuel-based boilers with new renewable energy.
The power plant will meet the entire need for Ørlandet Hovedflystasjon (ØHF) and is planned to be developed in two consecutive phases.

NLI Scope

E&I Installastion

Contact

Olav Bolseth
Mail: olav.bolseth@nli.no