Project Description
In connection with the development of Ørlandet fighter aircraft base, a new heat and cooling supply for the new building mass will be established and at the same time replace fossil fuel-based boilers with new renewable energy.
The power plant will meet the entire need for Ørlandet Hovedflystasjon (ØHF) and is planned to be developed in two consecutive phases.
NLI Scope
E&I Installastion
Contact
Olav Bolseth
Mail: olav.bolseth@nli.no