Project Description
Ris School pedestrian bridge is a steel bridge approximately 90 m long, with its main span over Ring 3. The main span of the bridge is 45 m long, supported by cables. The towers that connect the cables have a dominating impact on the appearance of the structure.
NLI Scope
Fabrication and Installation
90 meter and curved (with 4,3 m)
Fabrication and surface treatment performed by NLI, in NLI`s facilities in Larvik
Contact
Tommy Hansen
Mail: tommy.hansen@nli.no